S-Curve
A display of cumulative costs, labor hours or other quantities plotted against time.
Source
Schedule
A Schedule is the timetable for a project. It shows how project tasks and milestones are planned out over a period of time.
Source
The start and finish dates calculated by the resource scheduling program, having regard to resource constraints as well as project logic.
Source
Schedule Development
Developing a project schedule based on activity sequences, activity durations and resource requirements.
Source
Schedule Performance Index (SPI)
Ratio of work accomplished versus work planned, for a specified time period. The SPI is an efficiency rating for work accomplishment,comparing work accomplished to what should have been accomplished.
Source
Schedule Variance
The difference between the budgeted cost of work performed and the budgeted cost of work scheduled at any point in time (BCWP-BCWS).
Source
Scheduled Finish
The date calculated by the resource scheduling program as the earliest date on which an activity can finish, having regard to resource constraints as well as project logic.
Source
Scheduled Start
The date calculated by the resource scheduling program as the earliest date on which an activity can start, having regard to resource constraints as well as project logic.
Source
Scheduling
Scheduling is the process of determining when project activities will take place depending on defined durations and precedent activities. Schedule constraints specify when an activity should start or end based on duration, predecessors, external predecessor relationships, resource availability, or target dates.
Source
Scope
The scope is the sum of work content of a project.
Source
Breaking down a deliverable in to smaller manageable parts to ensure better control.
Source
Scope of Work
A chronological description of the work to be accomplished or resources to be supplied.
Source
Scope Verification
Ensuring all identified project deliverables have been completed satisfactorily.
Source
Security Plan
A plan to abide by security measures related to the project.
Source
Semi-Time-Scaled Logic Drawing
A drawing in which the positioning of the activities is modified somewhat by some date. Unlike true time-scaled drawings in which all horizontal positions correspond to a point in time, semi-time scaled logic drawings simply group activities whose dates fall within a specific time period.
Source
Senior Technical
A member of the project board who represents the interests of the development and operational organizations.
Source
Senior User
A member of the project board who represent the interests of user and others affected by the project.
Source
Sequence
Sequence is the order in which activities will occur with respect to one another. This establishes the priority and dependencies between activities. Successor and predecessor relationships are developed in a network format. This allows those involved in the project to visualize the work flow.
Source
An estimate of the cost of a product or service used to provide an assessment of the reasonableness of a prospective contractor’s proposed cost.
Source
Skill Groups
Some computer packages allow the definition of resources by their skills. The scheduling algorithm then chooses the most appropriate resource for an activity based on its availability and skill.
Source
Skills
A feature of hierarchical resources that allows you to assign an attribute to a resource, and to define the resource requirement for an activity in terms of that attribute.
Source
Slippage
Slippage is the amount of slack or float time used up by the current activity due to a delayed start. If an activity without float is delayed, the entire project will slip.
Source
Smoothing
This refers to a resource-scheduling option that modifies the way time-limited scheduling (and resource-limited with thresholds) works. The objective of time-limited scheduling is to minimize the maximum extent that each resource availability needs to be exceeded, and the standard algorithm gives itself the maximum flexibility to achieve this by making use of any excess already incurred. The smoothing option modifies this so that it will not use the excess for a particular activity unless necessary in order to schedule that activity within its total float.
Source
Soft Project
A project that is intended to bring about change and doe not have a physical end product.
Source
Soft Skills
Soft skills include team building, conflict management and negotiation.
Source
Solicitation
The process of obtaining quotes, bids or proposals.
Source
Solicitation Planning
Identifying targets for quotes, bids or proposals.
Source
The total budgeted funds, based on the same subcategories as the cost plan, for a given task area over a given fiscal year.
Source
Spending Plan Adjustments Form
A form used to change and authorize a spending plan adjustment during a fiscal year. The form explains why the spending plan and the cost plan do not match.
Source
Splitting
In resource scheduling, it is possible to specify that an activity may be split if this results in an earlier scheduled finish date. This means that the specified duration may be divided into two or more pieces, while retaining the specified profile for resource requirements relative to this split duration.
Source
Start-to-start lag is the minimum amount of time that must pass between the start of one activity and the start of its successor(s). This may be expressed in terms of duration or percentage.
Source
Starting Activity
A starting activity has no predecessors. It does not have to wait for any other activity to start. Many PM software packages permit multiple start activities if needed.
Source
Statement of Work (SOW)
A description of product and service to be procured under contract; a statement of requirements.
Source
Written reports given to both the project team and to a responsible person on a regular basis stating the status of an activity, work package, or whole project. Status Reports should be used to control the project and to keep management informed of project status.
Source
Stretching
In resource scheduling it is possible to specify that an activity may be stretched if this results in an earlier scheduled finish date. This means that the specified duration may be increased, while the specified profile is reduced proportionally.
Source
Subcontract
A contractual document which legally defines the effort of providing services, data, or other hardware, from one firm to another.
Source
Subnet
A division of a project network diagram representing a subproject.
Source
A group activities represented as a single activity in a higher level of the same.
Source
Subsequent Application Review (SAR)
A review by customer personnel to determine whether the contractor has properly applied the C/SCSC to a new contract.
Source
Successor
A successor is an activity whose start or finish depends on the start or finish of a predecessor activity. Refer to PREDECESSOR for related information.
Source
An activity that is behind schedule is considered to be super-critical. It has been delayed to a point where its float is calculated to be a negative value. The negative float is representative of the number of units an activity is behind schedule.
Source
System
The complete technical output of the project including technical products.
Source
System Acceptance Letter
A letter signed by the senior technical member of the project board after ensuring the project has completed system test requirements and is ready for user acceptance.
Source
Systems and Procedures
Systems and procedure detail the standard methods, practices and procedures of handling frequently occurring events within the project.
Source
Systems Management
Management that includes the prime activities of systems analysis, systems design and engineering and systems development.
Source