Backward Pass
A procedure within time analysis to calculate the late start and late finish dates of all activities in a project.
Source
Balanced Matrix
An organizational matrix where functions and projects have the same priority.
Source
Bar Chart
A view of project data that uses horizontal bars on a time scale to depict activity information. Frequently called a Gantt chart.
Source
Baseline
A copy of the project schedule for a particular time (usually before the project is started) that can be used for comparison with the current schedule.
Source
Baseline Dates
Original planned start and finished dates for an activity. Used to compare with current planned dates to determine any delays. Also used to calculate budgeted cost of work scheduled for earned-valued analysis.
Source
Baseline Review
A customer review conducted to determine with a limited sampling that a contractor is continuing to use the previously accepted performance system and is properly implementing a baseline on the contract or option under review.
Source
Baseline Schedule
The baseline schedule is a fixed project schedule. It is the standard by which project performance is measured. The current schedule is copied into the baseline schedule which remains frozen until it is reset. Resetting the baseline is done when the scope of the project has been changed significantly, for example after a negotiated change. At that point, the original or current baseline becomes invalid and should not be compared with the current schedule.
Source
Batch Operations
Operations performed by the computer without the need for any user intervention. In Open Plan, it is possible to define and subsequently process batches of data for reporting, merging, time analysis and resource scheduling, as well as back-up and restore operations.
Source
BCWP
Budget Cost of Work Performed.
Source
BCWS
Budget Cost of Work Scheduled.
Source
Benefits
The enhanced efficiency, economy and effectiveness of future business operations to be delivered by a program.
Source
Benefits Framework
An outline of the expected benefits of the program, the business operations affected and current and target performance measures.
Source
Benefits Management
Combined with program management, Benefits Management is the process for planning, managing, delivering and measuring the program benefits.
Source
Benefits Management Plan
Specifies who is responsible for achieving the benefits set out in the benefit profiles and how achievement of the benefits is to be measured, managed and monitored. The Benefits Management Plan is part of the program definition.
Source
Benefits Profiles
Located in the program definition, the Benefits Profiles describe the planned benefits to be realized by the program. The benefits profile also states where, when and how they are to be realized.
Source
Bottom Up Cost Estimating
This is the method of making estimates for every activity in the work breakdown structure and summarizing them to provide a total project cost estimate.
Source
Brainstorming
The unstructured generation of ideas by a group of people.
Source
Breakdown Structure
A hierarchical structure by which project elements are broken down, or decomposed. See also Organizational Breakdown Structure (OBS) and Work Breakdown Structure (WBS).
Source
Budget
The planned cost for an activity or project.
Source
Budget at Completion (BAC)
The sum total of the time-phased budget.
Source
Budget Cost
The cost anticipated at the start of a project.
Source
Budget Element
Budget elements are the same as resources -- the people, materials, or other entities needed to do the work of the program. For example, Engineer, Technician, Travel, and Pipe can all be budget elements. These budget elements can be validated against a Resource Breakdown Structure (RBS). Budget elements are typically assigned to a work package, but can also be defined at the cost account level.
Source
Budget Estimate
See Estimate.
Source
Budget Unit
The budget unit is the base unit for the calculation. For example, the Engineer budget element might have a budget unit of hours. Since budget units are user defined, they can be any appropriate unit of measure. For example, a budget unit might be hours, dollars, linear feet, or tons.
Source
Budgeted Cost of Work Performed (BCWP)
A measure used in earned value management system that allows you to quantify the overall progress of the project in monetary terms. BCWP is calculated by applying a performance measurement factor to the planned cost. (By comparing BCWP with ACWP, it is possible to determine if the project is under or over budget.) Another term for BCWP is "earned value."
Source
Budgeted Cost of Work Scheduled (BCWS)
The sum of the budgets for all planned work scheduled to be accomplished within a given time period. This term is often used to designate the cumulative to-date budget.
Source
Budgeting
Time phased financial requirements.
Source
Burden
Overhead expenses distributed over appropriate direct labor and/or material base.
Source
Business Assurance
Ensuring that actual costs and elapsed time is in line with plan costs and schedule times and that the business case remains available.
Source
Business Assurance Coordinator
A person in the project assurance team who is responsible for planning, monitoring and reporting on all business assurance aspects of a project.
Source
Business Case
A document used to justify the commitment of resources to a project.
Source